S.R. 0424 Section 380 (Hazleton Beltway) Extension

Hazleton-Beltway-1
Hazleton-Beltway-2
Hazleton-Beltway-3
Hazleton-Beltway-1
Hazleton-Beltway-2
Hazleton-Beltway-3

Project details

  • Project Name: S.R. 0424 Section 380 (Hazleton Beltway) Extension
  • Project Client: PennDOT District 4-0
  • Project Location: Luzerne County, Pennsylvania

This project involved the S.R. 0424, Section 390 extension (Hazleton Beltway) from the I-81/Exit 141 Interchange to Humboldt Industrial Park (HIP). This 1.1-mile long extension involved the construction of a four-lane roadway from the current termination of the beltway just west of I-81 to Commerce Drive and required an at-grade railroad crossing to provide access to the White Birch Road extension directly south of the railroad.  The roadway extension now provides secondary and emergency access between I-81 and Humboldt Industrial Park, as well as additional incident management for local roadways along I-81. The extension was designed to parallel I-81 and the existing railroad line as close as possible to minimize environmental impacts.

Services Provided:

  • Environmental Assessments
  • Wetlands studies and mitigation design
  • Threatened & Endangered Species studies
  • Cultural Resources
  • Socioeconomic Studies
  • Permitting