P3 Rapid Bridge Replacement Project

Project details

  • Project Name: P3 Rapid Bridge Replacement Project
  • Project Client: PennDOT and Walsh/Granite
  • Project Location: Statewide, Pennsylvania

A.D. Marble was the lead environmental and cultural resource firm for the unprecedented Pennsylvania Rapid Bridge Replacement Project. The project is a Public-Private Partnership (P3) undertaken on behalf of the Pennsylvania Department of Transportation (PennDOT) and the Federal Highway Administration (FHWA). The project consists of the replacement of 470 bridges throughout the Commonwealth of Pennsylvania in an expedited time frame of 36 months. A.D. Marble’s role on the contract was to conduct all environmental and cultural resource investigations required as part of the National Environmental Policy Act (NEPA) and state and federal permitting.